About Us
The Huntington Water Quality Board provides sanitary sewer service to Huntington and the surrounding communities. It also maintains storm water lines in Huntington and oversees the city’s floodwall and levee system.
The Water Quality Board handles sanitary sewer service for more than 27,000 metered residential, commercial and industrial customers in Huntington and surrounding areas, including the towns of Ceredo and Kenova and the Northern Wayne, Spring Valley and Pea Ridge Public Service Districts. It operates the largest collection and treatment system in West Virginia.
Approximately 325 miles of sewer lines (many of which are more than 100 years old), 47 sewage pump stations and 132 grinder pump stations help send sewage to the wastewater treatment plant, which has an average flow of 9 to 12 million gallons on a dry-weather day. The treatment plant was built in 1964. A comprehensive upgrade and expansion of the plant is expected to be completed by 2030.
The Water Quality Board also oversees an annual, citywide street-sweeping service that begins in April and runs through October to prevent debris from entering the collection system.
The Water Quality Board also maintains the floodwall and levee system, which is 11.4 miles long and includes 17 flood pump stations that prevent the Ohio and Guyandotte rivers from flooding Huntington. This system was built by the U.S. Army Corps of Engineers following the devastating 1937 flood.
The Water Quality Board also manages stormwater runoff through a system of storm lines and catch basins. These lines and basins take rainwater from the streets and help move it to the Ohio and Guyandotte rivers quickly and efficiently. These basins and lines must be kept free of debris to operate with maximum impact.
The Water Quality Board also works with developers and engages in public outreach to minimize pollution entering the sewer system before it flows into our waterways.
Meet the board

Mayor Patrick J. Farrell
Chairman

Danny Vance
Vice Chairman

Audy Perry
Board Member
Meet the team

Brian Bracey
Chief Executive Officer



Lee Adams
Associate Director of Sanitary Operations

Jeff Brady
Senior Engineer

Scott Kelley
Chief Operations Superintendent of Wastewater Treatment Plant

Paul McDanald
Assistant Chief Operations Superintendent of Wastewater Treatment Plant

Carrie Denvir
Pretreatment Coordinator

Sherry Wilkins
Director of Stormwater Operations

Trent Vinson
Floodwall Manager

David Dennis
Stormwater Program Analyst